EMAIL
info@voltpowercontracting.com
Call Now
(+974) 4456 7318
login
Home
About
About
Chairman's Message
CEO's Message
Products
Electricity Smart Meters
Bus Bar
Linkbox
Services
Electrical Works Divisions
Civil Works Division
Mechanical Works Division
Testing & Commissioning Department
Field Support Department
Downloads
Gallery
ISO Certificates
Contact Us
Civil Work Division
Home
Civil Work Division
Civil Work Division
Topographical survey
Route verification as per tender documents and site reconnaissance survey
Collection of government control points from GIS department for survey works
Collection of future plans of the route area from Urban Planning Department
Topographical survey of finally proposed route based on site studies and future plans
Preparation of Topographical Survey Reports
Preparation of Topographical Survey Drawing
Route Site investigation for critical crossings and proposed joint bays location
Collection of Pipe Lines and Existing Cable routes as built drawings from concerned Authorities.
Route investigation drawings and reports
Preparation of cable route trial pits drawings
Preparation of trial pits reports for underground services
Reporting of soil samples thermal resistivity values
Material Investigation
Thermal backfill material mix design preparation as per required Thermal Resistivity values
Existing soils Thermal resistivity values investigation
Maximum dry density Testing / calculation for back fill material
Cable route design drawings
Preparation of cable route bonding schematic diagram
Preparation of Typical Joint Bays arrangement drawings
Preparation of Typical Joint Bays Earthing arrangement drawing
Preparation of cable route joint bays and road crossings location drawings
Preparation of detailed cable route drawings based on trial pits reports.
Preparation of route profile drawings as per existing and route area planned future levels
Preparation of AS BUILT drawings after completion of site activities
Preparation of cable route marker location drawings
Road Crossings / pipe lines crossings Drawings
Preparation of Horizontal Directional Drilling (HDD) Profile drawings for important road crossings
Preparation of Open Cut (OC) crossings details as per site requirements
Preparation of PIPE LINES crossings details as per the concerned Authorities requirements
Design / drawing preparation of Reinforced Concrete duct banks to bridge over open trench pipe line crossings
Concrete structure Design
Joint bays concrete structure design calculation
Preparation of joint bays structural details drawing
Link Box Pit concrete structure design calculation
Preparation of Link Box Pit structural details drawing
Fibre Optic Cable splice pit structure design calculation
Preparation of Fibre Optic Cable splice pit structural details drawing
PD sensor pit (in case separate pit) structure design calculation
Preparation of PD sensor pit structural details drawing